Mike DeFusco’s plan calls for three distinct areas in the 100,000-square foot facility – railside, harborside and what he dubs a “grand hall” on the building’s second floor. In the short term, he says he has helped secure a commitment from the terminal’s operator for an outdoor French-inspired marketplace at Warrington Plaza, which is being planned with the goal of opening in Spring 2018.